- Home
- Government
- Departments
- Public Works
- Engineering
- Development Engineering
Development Engineering
Development Engineering is a work unit in the Engineering Division within the Department of Public Works (as of the beginning of January 2017). The role of Development Engineering is to be a resource to the public and the organization as a whole. Development Engineering oversees the reviews of infrastructure installation, for example, for drainage or a sewer and water line by a developer subdividing a piece of property or for a stormwater line applicable to a road that needs to be built to service a new home or commercial building. Development Engineering assesses the designs provided and gives input, carries out site visits and inspections, and accepts assets into City ownership. Over the course of a land development project, you can expect to spend some time with the Development Engineering team. Development Engineering will work with you to ensure that the assets you create are a good fit for your project and in accordance to the City’s standards and requirements.
*** TRANSPORTATION IMPACT FEE *** (link)
Site Assessment Review or SAR
The Site Assessment Review (SAR) process is required by chapter 15.19 of the Bainbridge Island Municipal Code (BIMC) and is an opportunity for you and your design professionals to learn more about the Stormwater requirements for your project. During the SAR process, you will receive feedback from a Development Engineer and other City staff as appropriate. City staff will assist you in identifying project requirements and potential issues; staff will not provide or suggest a specific Stormwater design for your project but may provide recommendations on Low Impact Development (LID) strategies applicable to your site and project.
Please see the LID links and guidance page that will list the site assessment requirements needed for a planning permit Pre-Application Meeting per the COBI Administrative Manual. Additionally, you will find information on the proposed Ordinances and Resolutions implementing the site assessment changes and some other useful links and guidance on the new requirements for permitting.
Title VI Notice
The City of Bainbridge Island fully complies with Title VI of the Civil Rights Acts of 1964 and related statutes and regulations in all programs and activities. Americans with Disabilities Act (ADA): Individuals requiring reasonable accommodations may request written materials in alternate formats, sign language interpreters and physical accessibility accommodations. For more information, contact the City Clerk’s office via email at 206-842-2545.
.
Contact Us
-
Development Engineering
280 Madison Avenue N
Bainbridge Isl., WA 98110
206.842.2016
Inspection Line: 206.780.3788Counter Hours:
Appointments preferred, visit scheduler link below or call 206.842.2016 to make appointment. (Walk-ins may be seen during counter hours depending on availability).
- Wed 9-11 AM (In person or phone)
- By appointment only, visit scheduler link: https://www.bainbridgewa.gov/1110/
- then select: “15 Minute Q&A (free) with Development Engineering”
Paul Nylund, PE
Engineering Manager
206.780.3783
EmailNick Rasor, PE
Development Engineer
206.780.3745
EmailKenton Bruno, EIT
Development Engineer
206.780.3779
EmailAaron Quitslund
Construction Inspector
206.780.3782
Email